Roads, Bridges & Trails
Recents projects completed or under construction by Pinellas County and the 24 cities.
131st Street N Intersection Improvements
Improve intersection safety on 131st St. at 82nd Ave. and 86th Ave.
13th Street at Sands Point Drive Bridge Replacement
The proposed 13th Street bridge will have an overall width of 49 feet, providing two 12-foot lanes, shoulders, and 6-foot sidewalks on both sides.
22nd Ave S – 51st St S to 34th St S Roadway Improvements
This project consisted of milling and resurfacing 22nd Avenue South from 51st Street to 34th Street, with road widening
40th Avenue Placido Bayou Bridge
The 40th Avenue Bridge was constructed using innovative materials and construction methods to provide a longer-lasting structure.
42nd Avenue Street, Drainage and Sidewalk Improvements
Drainage and sidewalk improvements along 42nd Ave. in Lealman.
46th Ave N. from 49th St N. to 38th St N.
Construction of ADA-compliant sidewalks, curb ramps and drainage improvements to provide a pathway for pedestrians and bicyclists.
62nd Avenue N & 25th Street N Sidewalk Intersection Improvements
Intersection and sidewalk improvements to provide safer, easier travel.
67th Street N. Roadway Improvements
Roadway improvements along two sections of 67th Street North.
71st Street N Roadway and Sidewalk Improvements
Roadway, drainage and sidewalk improvements along a 1-mile segment of 71st Street N, from 38th Avenue N to 54th Avenue N
Belleair Road ADA & Sidewalk Upgrades
Safety improvements on Belleair Road from S Ft Harrison Avenue to U.S. 19
Blind Pass Road Complete Streets Reconstruction
Safety and accessibility improvements along Blind Pass Road in St. Pete Beach, FL.
Carl Avenue and Shirley Avenue
Paving, drainage enhancements, addition of street lights and sidewalks on both sides of the road.
Countywide Traffic Signalization Improvements
Improve security and safety by installing mast arm traffic signals.
Crosswinds Drive Bridge Replacement
Improve safety for neighborhood residents by replacing the Crosswinds Drive bridge.
Dunedin Milling and Pavement Restoration
Milling and paving of streets throughout Dunedin
Gulf Boulevard & Walsingham Road Intersection
Improvements to the road, sidewalks, and landscaping to enhance pedestrian safety and traffic movement.
Harbor Palms Phase 3
Improvement of all roads, sidewalks, curbs, and stormwater catch basins and replacement of the entire water system in the Harbor Palms neighborhood in Oldsmar.
Hercules Avenue Sidewalk Phase II
Sidewalk improvements on Hercules Ave. from Sherwood St. to Sunset Point Rd.
Indian Rocks Road
Complete roadway reconstruction, stormwater system improvements, and a new multimodal sidewalk.
Keystone Road Guardrail Construction
Safety improvements on Keystone Road from East Lake Road to Hillsborough County.
Mehlenbacher Road Sidewalk Improvements
Improve pedestrian safety with sidewalk improvements on Mehlenbacher Road.
Municipal Services Taxing Unit Paving Program
This program paves unpaved roads in unincorporated Municipal Services Taxing Unit areas.
Oakwood Drive Bridge Replacement
Improve safety for neighborhood residents by replacing the Oakwood Drive bridge.
Old Coachman Road Bridge Replacement
Construction of a 69-foot-long bridge with two 11-foot lanes, 5-foot shoulders and 5-foot sidewalks on both sides.
Oldsmar Douglas Road Trail
Adds an approximately 10-foot-wide trail to enhance mobility options for the community and businesses located within the Cypress Lakes Industrial Park region.
Oldsmar Douglas Road Widening
Widening and improvements that address safety, connectivity, and efficiency for cars, trucks, buses, cyclists and pedestrians.
Oldsmar Pedestrian Trail Bridge Renovations
Renovation of three pedestrian bridges in the Moccasin Creek Recreation Area in Oldsmar.
Osgood Point Trail
Provides connection between Gulfport and St. Petersburg, enhancing transportation, accessibility, and mobility for pedestrians and bicyclists.
Pass-A-Grille Way Renovation
Stabilization of the road and sidewalk by addressing compromised soil and seawall conditions.
Pinellas Trail Loop North Segment
Extend the Pinellas Trail 6.8 miles in north Pinellas County.
Pinellas Trail South Gap – 126th Ave N. to Ulmerton Rd.
The South Gap of the Pinellas Trail will extend from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo.
Rosery Road Phases I & II
Enhancements include upgraded sidewalks, a mixed-use path, mid-block crossings, refreshed drainage, improved water mains, and added landscaping.
Starkey Road Sidewalk Improvements
Install five-foot sidewalks on both sides of Starkey Road between East Bay and Ulmerton Roads.
Trotter Road Reconstruction
Project included upgraded curb and sidewalk infrastructure, continuous bicycle lanes, improved intersections, street trees, transit stop improvements, and enhanced drainage.
Virginia Avenue Sidewalk Improvements from CR 1 to N. Hercules Avenue
Sidewalk improvements to benefit pedestrian safety and connectivity from Keene Road (CR-1) to Hercules Avenue.
Westwinds Drive Bridge Replacement
Improve safety for neighborhood residents by replacing the Westwinds Drive bridge.
Whitney and Wolford Roads Intersection and Roadway Improvements
This project includes roadway, drainage, sidewalk and traffic safety improvements to the intersection of Whitney Road and Wolford Road.
Note: This page represents select projects supported by the Penny over the past decade. For a full list of projects, check Pinellas County’s Annual Capital Improvement Plan or check with your city. To see a map of historic project accomplishments (1990-2019), see the Historic Accomplishments Map.